Projects

Jerritt Canyon Photo Gallery

Saval 4 Opening Ceremony 2014

Presentation by Graham Dickson, COO

Presentation by Graham Dickson, COO

Interviewing by reporters

Graham Dickson, COO cutting ribbon in front of the portal

Shaun Heinrichs, CFO cutting ribbon in front of the portal

Veris Gold Staff ready for ribbon cutting ceremony

Charles Boyd, supplier with Atlas Copco cutting ribbon in front of the portal

Saval 4 Development 2014

Dirtwork at Saval 4

Saval 4 Development

Surveying

Saval 4 Main Underground Portal

Saval 4 Main Underground Portal

Saval 4 Main Underground Portal

Saval 4 Main Underground Portal

Saval 4 Main Underground Portal

Graham Dickson, COO and Lucky at the Saval 4 Portal

Ventilation at Saval 4 Main Underground Portal

Ventilation at Saval 4 Main Underground Portal

Ore Truck at Saval 4

Secondary Access Portal Site Clearing

Secondary Access Portal Site Clearing

Secondary Access Portal Site Clearing

Secondary Access Portal Site Clearing

Secondary Access Portal Site Clearing

Secondary Access Portal Site Clearing

Loading Face Round

Secondary Escape

Breakthrough Secondary Escape

Blasting Crew

Saval 4 Asbuilt Map

2013

Gold Button formerly produced at Jerritt Canyon

Gold Bar produced at Jerritt Canyon

Chipping slag off of a newly poured gold bar

Gold and slag cascading down the mold at Jerritt Canyon

Gold and slag cascading down the mold at Jerritt Canyon

Starvation Canyon Official Opening July 2013

John Ellison, Nevada Assemblyman, giving a speech at Starvation Canyon Opening Ceremony, July 2013

Starvation Canyon Opening Ceremony July 2013

Chris Johnson, Mayor of Elko cutting ribbon at Starvation Canyon Opening Ceremony July 2013

The SMD team cutting ribbon at Starvation Canyon Opening July 2013

Joe Knaack, Mine Superintendent of SMD cutting ribbon at Starvation Canyon Opening July 2013

Graham Dickson, COO cutting ribbon at Starvation Canyon Opening Ceremony July 2013

Graham Dickson, COO and Todd Johnson, VP of Exploration at Starvation Canyon Opening Ceremony July 2013

Ore Truck at the Starvation Canyon portal

Ore Trucks at Starvation Canyon July 2013

Saval 4 Development July 2013

Commenced bolting around the portal area of Saval 4 Mine July 2013

Commenced bolting around the portal area of Saval 4 Mine July 2013

Commenced bolting around the portal area of Saval 4 Mine July 2013

2013 Annual Maintenance

Shaft being re-installed after installation of OSEPA Impeller

New Impeller OSEPA Air Classifier for Dry Grinding Circuit

Roaster Cyclone inside the 10th Floor of the Roaster July 2013

Roaster Cyclone moving into the top floor of the Roaster July 2013

"Eclipse of the Cyclone" Roaster Cyclone being lifted to the top of the Roaster July 2013

Ore being hauled from Starvation Canyon portal

Significant improvements to the Thickener at the mill with clear overflow water (After)

Thickener at the mill (Before)

DASH Water Treatment Plant at Jerritt Canyon

Heap Leach Draindown Collector at Jerritt Canyon

Duck Pond Seepage Pond Reclamation (After) - The area has been filled and contoured.

Duck Pond Seepage Pond Reclamation (Before) - Installing pumps and pipes with the excavator

Brand new synthetically, double-lined Tailings Storage Facility (TSF-2)

Commissioning of Tailing Storage Facility, "TSF-2" completed March 2013

2012

Veris Gold Starvation Canyon Mine portal December 2012

Starvation Canyon Mine officially opened, November 2012.

Commenced bolting around the portal area of Starvation Canyon November 2012.

Commenced bolting around the portal area at Starvation Canyon November 2012.

TSF2 from a distance with evaporation pond on the left (with water) and WSR E right (with water).

TSF2 lining nearly complete (now complete).

Lining crews working to complete the liner installation in TSF2

Longhole stope being drilled using a Cubex ITH drill

Longhole stope drilled off (red cones are the holes)

Cubex ITH drill set up and drilling longhole stope.

Both roasters operating!

Lowering rebuilt carbon screen into place, January 2012

Quench tank 99% complete, January 2012

Quench tank base ready for new tank, January 2012

Thickener repairs almost completed, January 2012

Roof removed for installation of new quench tank, January 2012

Ball mill bull gear with new pinion installed, January 2012

Dryer installation completed January 2012

Cleaning out thickener for maintenance, January 2012

2011

Installing the new dryer December 2011

New Progress on TSF2 December 2011

New Progress on TSF2 December 2011

New TSF2 Progress, November 2011

New TSF2 Progress, November 2011

New Dryer Installation in Progress, November 14, 2011

New Dryer Installation in Progress, November 14, 2011

Unloading the New Dryer, November 12, 2011

Unloading the New Dryer, November 12, 2011

Baghouse and Scrubber, October 31, 2011

New Baghouse and Dryer Burner Installation, Oct 31, 2011


Previous. All pages. Next. Page 1. Page 2

 
Veris Gold Corp.
900-688 West Hastings Street
Vancouver BC V6B 1P1
Canada

Tel: 1 (604) 688-9427
NA Toll Free: 1 (855) 688-9427
Fax: 1 (604) 688-9426
Email: